The stable of locos and stock also increased by use of  birthdays and good old e-bay.

Expansion

To contact us:

Email: avr@intermidlands.co.uk

We expanded the fright line so that it looped off and around a rose bed near the green house.

The picture shows the slow line descending from the high level ready to spiral left before re-appearing from the tunnel.  The freight line now proceeds across the slow line and returns and shares the slow line track for  a few metres.

by doubling up on more and more of the originally shared track.

During 2006 the freight line gradually became separated from the slow line