
|
.
|
First Trials
|
|
To contact us: |
|
Email:
avr@intermidlands.co.uk |


|
We decided
early on to run LGB stock under MTS
control. The railway is mixed in all
senses of the word and has no pretensions to be anything or anywhere or any
specified time period. |
|
We began
with starter sets and extra track and initially had about 120 meters of track
around the garden. We operated a pair
of Stainz locos with the red and blue coaches on the slow line with some
simple switching to ensure we did not have head on collisions at the passing
loop. We ran freight and a green coach
train on the flat loop and began creating a small village near the passing
loop and an interchange station near the reversing loops. |